Skip to content
BathSpaceby LUXEhome Discuss my bathroom Enquire

Completed BathSpace project

Nawala Airbnb Bathroom Renovation

Nawala · Completed: 29 September 2026

The brief

What the family asked for

The client wanted a warmer, more practical bathroom for an Airbnb property: a premium guest experience, better separation of the wet and dry areas, and a layout that made sensible use of the existing angled wall.

Project investment Final project value · LKR 1.881M
Discuss a project like this

The story

An existing bathroom in Nawala needed more than new tiles. The client's Airbnb property called for a welcoming, premium and practical guest bathroom, with better separation between the wet and dry areas. The existing angled wall was one of the layout challenges to resolve.

BathSpace by LUXEhome managed the renovation as one connected project: site preparation and demolition, civil corrections, new concealed plumbing and electrical work, wet-area waterproofing, tiling, ceiling and lighting, custom vanity, bathware, shower glass, testing, cleaning and handover. The room was designed for everyday use as well as its final appearance.

The finished specification includes Rocell tiles, Swiss bathware and fittings, Geberit concealed-cistern equipment, a quartz vanity top, eco-board cabinetry and 10 mm shower glass. The design includes a curved, sandblasted glass divider, helping distinguish shower and dry zones.

Quality checks were recorded as the work progressed. The plumbing test passed on 23 August 2026 without issues. The waterproofing system passed a two-day flood test on 27 August 2026. All recorded final handover checks passed, and the bathroom was formally handed over on 29 September 2026.

At handover, the site was cleaned, bathroom fixtures and functions were checked, care and warranty information was provided, and one spare tile was retained for future repairs. The recorded final project value was LKR 1,881,000.

Before the renovation

The original bathroom before BathSpace started work.

Nawala Airbnb Bathroom Renovation before renovation

What went into this bathroom

Materials, fixtures & finishes

A record of the systems behind the walls and the finishes you can see. Every project has its own selections and specifications.

Finishes, fixtures & fittings Tiles, bathware, brassware, lighting, vanity and other visible details

Tiles

Wall and floor tiles

Rocell

800 × 800 mm, matte finish; exact tile code to confirm

Ceiling

PVC ceiling panels

iPanel

PVC ceiling board/sheets

Lighting

Bathroom lighting fixtures

Locally sourced fixtures; brand and models not recorded

Sanitaryware

Wall-hung concealed WC

Swiss Bathware · Model: Pop

Wall-hung Swiss WC with concealed cistern

Sanitaryware

Concealed cistern

Geberit

Concealed WC flushing system

Sanitaryware

Countertop washbasin

Swiss Bathware · Model: NA300

Countertop basin

Vanity

Custom vanity countertop

Quartz vanity top

Vanity

Custom vanity cabinet

Made-to-measure Eco Board cabinetry

Mirror

Custom bathroom mirror

Made-to-measure mirror

Shower glass

Sandblasted shower partition

10 mm tempered glass, sandblasted/frosted finish

Brassware

Concealed shower fittings

Swiss Bathware

Concealed shower fitting; exact model to confirm

Accessories

Angle valves

Swiss Bathware

Bathroom angle valves

Accessories

Towel bar, robe hook, tumbler holder, soap dish and other accessories

Swiss Bathware

Bathroom accessory set; exact models to confirm

Door

Custom timber bathroom door

Jackwood timber; water-based finish, product to confirm

Construction & installation materials Plumbing, electrical, waterproofing, tile fixing and civil materials

Civil work

Wall plastering and civil mortar

Tokyo Super cement / sand

Sand-and-cement plastering and civil work; exact cement trade name to confirm

Plumbing

Water supply and drainage pipework

S-lon

Pipework and associated plumbing fittings

Electrical

Electrical wiring

ACL

Bathroom wiring and electrical installation

Electrical

Switches and electrical accessories

Polycorn / Polychrome

Brand spelling and exact products to confirm

Waterproofing

Two-component waterproofing system

Tokyo Super · Model: 2K

Wet-area waterproofing; two-day flood test recorded as passed

Tiling installation

Tile adhesive

Swisstek

Wall and floor tile installation

Tiling installation

Tile grout

Swisstek

Tile joint finishing

Tiling installation

Tile levelling system

Used for tile alignment during laying

Sealants

Silicone sealant

Bathroom fixture, junction and perimeter sealant work; brand to confirm

Materials shown were used in this completed bathroom. Current shop availability, variants and prices may differ from the original project contract and will be confirmed before an order is accepted.

The journey

From first message to handover — every stage, as recorded.

  1. Client inquiry & brief

    The Airbnb owner wanted a warm, premium and practical bathroom with clearer wet/dry zoning. The first design conversations established the goals and investment direction.

  2. Room assessment & layout planning

    The existing angled wall, bathroom layout, concealed services, access and finish decisions were considered together before the renovation work.

  3. Site preparation & demolition

    Existing fittings and affected finishes were removed, with preparation for the renewed room and coordinated technical systems.

  4. Civil, plumbing & electrical installation

    Plumbing and drainage, electrical points and the necessary civil work were coordinated before the wet areas and finish layers were closed.

  5. 23 August 2026
    Plumbing inspection

    The water-supply plumbing test passed with no recorded issues.

  6. 27 August 2026
    Waterproofing flood test

    A two-day flood test passed without reported issues before completion of the bathroom finishes.

  7. Tiling, ceiling & lighting

    Wall and floor tiling, grout, ceiling and lighting were finished around the approved design and technical layout.

  8. Vanity, bathware & shower glass

    Swiss fixtures, the concealed cistern, custom eco-board and quartz vanity, mirror, accessories and glass divider were installed and finished.

  9. Final checks & cleaning

    Plumbing, drainage, WC, shower, electrical items, lighting, ventilation, glass, surfaces and fittings were inspected, with final cleaning before handover.

  10. 29 September 2026
    Completed and handed over

    Final functional checks were recorded as passed, and the bathroom was handed over with its documentation.

The people behind the work

People Behind This Bathroom

From design and site supervision to skilled trades, specialist suppliers and finishing partners—these are the people who helped deliver this project.

C
Charitha Amarasinghe
Project design and layout planning · Founder & CEO, LUXEhome (Pvt) Ltd
S
Sandun Wasantha Kumara
Site supervision and measurements
R
Rukman Karunathilaka
All-round construction work, civil support and waterproofing
M
Mr. Jayathissa
Civil works with Rukman
R
Ranjith
Plumbing installation
K
Kaval
Plumbing installation
D
Dayananda Karunathilaka
Electrical wiring
K
Keshara
Tile laying and adhesive application
P
Power Pro Solutions
Ceiling installation
K
Kamal
Bathroom fixture installation
T
TSA Team
Custom vanity cabinetry
Y
Yasith Lakmal · YL Construction
Final shower-glass installation and finishing

Planning a bathroom renovation?

Start with a free phone or WhatsApp conversation. Our LKR 30,000 package per bathroom includes the site visit, layout plan, 3D images, walkthrough video and detailed quotation with materials and fixtures.

No payment to enquire. The LKR 30,000 package for each bathroom is credited in full if BathSpace builds that bathroom.